CC8.1: Change management

Changes to software and infrastructure are authorized, developed and tested in a controlled way, reviewed by someone other than the author, approved, and deployed with a way to roll back.

Category: Security (common criteria, required in every SOC 2 report) · Series: CC8 (Change management) · TSC 2017 (2022 points of focus)

That summary is Policyseed’s own paraphrase, written to be read next to the policy sections below. The authoritative wording is the AICPA’s Trust Services Criteria, which the CPA firm tests your controls against during the examination.

How auditors usually test CC8.1

Change management is tested by sampling. The auditor pulls the population of production changes for the period, usually merged pull requests or deploy logs, selects a sample and checks each for peer review, passing tests and approval before release. Emergency changes are checked for a review after the fact. The classic exception is a change merged by its own author, often an admin bypassing branch protection.

Example control for CC8.1

  • Every change to production code is reviewed by someone other than the author before merge. Documented in P09 Change Management. Evidence: Branch protection settings, plus a sample of merged pull requests with reviewer approval.

One way to meet the criterion, not the only one. The SOC 2 controls list has the other examples side by side.

Policies that address CC8.1

The Policyseed crosswalk points CC8.1 at 2 policies. Each link opens the full sample text at the section an auditor would read. Section 4 holds the statements management commits to; section 5 holds the procedures that produce evidence.

Preparing for ISO 27001 as well? The same policies are mapped to Annex A controls on the ISO 27001 policy templates page, so one document set can serve both. The Annex A controls that share a policy with CC8.1 are listed in the SOC 2 to ISO 27001 mapping.

Evidence examples for CC8.1

Artifacts a company of 5 to 200 people can realistically produce. The Audit Kit’s evidence checklist lists them per policy with an owner column so each one has a name against it before the examination.

  • Branch protection settings export requiring pull request review and passing checks before merge
  • Sample of merged pull requests from the period showing reviewer approval and CI status
  • CI/CD pipeline configuration file showing automated tests and the production deploy step
  • Emergency change record showing after-the-fact review, if any occurred

Readiness check questions for CC8.1

  • Does every production change go through a pull request with an independent review and passing checks?
  • Are production deployments done only through your CI/CD pipeline, not by hand?

They are 2 of the 20 questions in the free SOC 2 readiness check, which scores your answers in the browser and lists what to fix first.

Related criteria in CC8 (Change management)

CC8.1 is the only criterion in the CC8 series. Use the neighbours below to keep reading through the crosswalk.

Previous: CC7.5 Recovering from incidents. Next: CC9.1 Mitigating business disruption risk. All 38 criteria are listed on the template index.

Policyseed provides governance policy templates and AI tailoring. It is not legal advice and not a compliance guarantee. Management adopts the policies; the CPA firm performs the SOC 2 examination.